Viking Premier Homes Custom Built Modular Or Manufactured Homes

For the homebuyer seeking a sound opportunity to invest in a home for the family of high quality at competitive cost, today's OFF-SITE construction technology offers multiple benefits over alternative building methods.

10916-cropped

THE MAJOR BENEFITS OF OFF-SITE CONSTRUCTION ARE:

First, and the most evident, is the efficient shortening of the start-up to completion time from the typical eight to ten months to as little as sixty days, a net savings of up to six months. This time savings translates into substantial reductions in initial investment capital and financing charges. 

Second, numerous subcontractors and their scheduling problems which often result in delays and/or cost over runs are kept to a minimum since 90 percent of the construction takes place at a centralized engineering and production facility where technical and senior supervision is always present and highly skilled labor remains on staff.

Third, the quality of the construction is superior due to the availability of advanced specialized equipment custom designed to insure that each project is completed exactly as the architectural/engineering specifications require. This is checked and approved by State inspectors as well as by the investor. There are no surprises.

OFF-SITE CONSTRUCTION IS NOT A NEW CONCEPT...IT IS A CONSTRUCTION METHOD USED MOST OFTEN TO ACHIEVE THE BENEFITS SET FORTH ABOVE.

While the project retains the traditional ingredients of wood stud walls, drywall, exterior sheathing, etc., most of the structure is completed in the assembly facility and transported to the site for the brief finishing phase. These self -contained sections include all of the components such as plumbing, wiring, lighting fixtures, doors, windows and the many elements necessary to complete the project. The size of the sections are such that they are easily transported to the site. All construct ion meets or exceeds Federal standards as well as State and local requirements.

The various plans available have been designed by architects and engineers to incorporate land parcels suitable for a minimum 1,100 sq. ft. entry level home to custom designs of 4200 sq. ft. and much larger.  As the seasoned builder/developer knows various design options are critical for meeting homeowners’ requirements and creating a suitable living environment in the community thereby insuring a ready demand for the projects when completed.

109145-cropped
jpJrgyG-cropped

There is a reason why OFF-SITE construction is the fastest growing segment of the building industry today. This advanced technology represents benefits that are unique while delivering a quality built home in as little as 60 days from order to completion.  Consider OFF-SITE construction and the opportunity it offers to the knowledgeable homebuyer.

  • Confirmed and proven as an ideal alternative to site built housing which meets all state and local regulations and standards
  • Concept assures superior construction techniques with all critical elements under direct and expert supervision
  • Built 90 percent Off Site for rapid On Site finish to assure On Time completion and occupancy
  • Cost Control and Quality Construction built to HUD and UBC codes
  • Reduction of vendor and sub-contractor hassles

VIKING PREMIER HOMES, INC. HAS A LONG HISTORY OF PROVIDING HIGH QUALITY HOMES IN THE 11 WESTERN UNITED STATES AND IS PLEASED TO SHARE THE FOLLOWING INFORMATION WITH YOU.

We offer a wide range of Developer Series Homes, both in single and multi-family design. These products are approved and built to the H.U.D. manufactured housing code and U.B.C. building code. In building to these codes, it makes it virtually impossible to experience any zoning or approval problems.  In the design of the most popular application, the single family, Residential series was created. This series meets the needs of homebuyers whether for subdivisions or infill of scattered lots.

In the event we currently do not have the right floor plan for your specific needs, we have the ability to develop and design custom plans to f it almost any requirement necessary for the success of the project.

A newly constructed, modern home.
American Dream

Since our inception, it has been our goal to dispel the myth that manufactured housing is sub-standard when compared to its site built counterpart. We believe that after you review this information, you wiII have a new opinion of manufactured housing. This concept can provide you with a better and safer solution to the building process when compared to the centuries old stick-by-stick method still being used in today’s ever-changing market.

While the home is being constructed in the (off site) factory the on-site construction is begun and consists of garage, foundation, utility connections and installation. The above is an example of the cost of two different price category homes. It’s designed to provide you an overview and can change based on the specifications per your specific project and size home. In your consideration of this concept in housing, there are other areas to include in your analysis to properly evaluate your total savings.

THE KEY POINTS ARE AS FOLLOWS:

Homes are designed so that after lot preparation and installation of a foundation system, the home is just simply set in place. The home comes from the plant 90% complete. Coupled with your site work consisting of garage, flat work, connection of laterals, grading, carpeting, clean up and landscaping the completed package is ready for occupancy within 60 to 90 days.

DO YOU NEED ASSISTANCE WITH ALL YOUR REAL ESTATE NEEDS? LET US HELP.

If you want a quote from Viking premier homes, contact us.

Business Address

100 W. High Street, # 364 , Moorpark, California 93020

Email

Business Hours

Mon - Sun / 8:00 am - 5:00 pm

Phone

Phone: (805) 907-6170
Fax: (805) 553-9582

Licensed manufactured homes dealer.